6)
Don't underestimate your need for up-front
cash. Utilize the Pre Construction Budget
Worksheet at www.myconstructionloan.com
A Construction Loan does not pay pre-construction
costs such as: Perk test, septic plan,
soils engineering, building & foundation
plans, plot and site plans, appraisal &
credit reports or fees to municipality for
plan check, and etc.
7)
Initial Funds from a Construction Loans
are not disbursed until after the Site
Plan has been approved by the local government
agency.
8)
Lenders normally have a fixed draw schedule
tied to each part or phase of the construction
project.
- a. Typically, the lender will
send out an inspector to verify that
specific work has been completed.
- b. If the inspection passes,
funds will be released to pay subcontractors
and suppliers who completed work during
the inspected part or phase.
- c. If you request more draws
than allowed per project, you may be
charged a nominal fee per draw.
A
type of Construction Loan can include both
the construction line-of-credit and residential
mortgage as one loan known as a “Construction/Perm
loan”.
(See The Construction/Perm Loan) at www.myconstructionloan.com
[CONTINUE]
|
|
|
|
|
©